IAS 37 Provisions, Contingent Liabilities and Contingent Assets sets out when a liability of uncertain timing or amount is recognised on the balance sheet, how it is measured, and what must be disclosed when it is not recognised.

The three recognition criteria

A provision is recognised when all three conditions are met:

  1. The entity has a present obligation (legal or constructive) as a result of a past event.
  2. It is probable that an outflow of resources embodying economic benefits will be required to settle it. "Probable" means more likely than not.
  3. A reliable estimate can be made of the amount of the obligation.

A constructive obligation arises from the entity's own actions, such as an established pattern of past practice or a published policy, that creates a valid expectation in others that it will discharge certain responsibilities. A future intention alone is not an obligation. An entity cannot provide for future operating losses.

Provision, contingent liability or nothing

Measurement

Onerous contracts

If an entity has a contract in which the unavoidable costs of meeting its obligations exceed the economic benefits expected to be received, it recognises a provision for the present obligation under the contract. The unavoidable cost is the lower of the cost of fulfilling the contract and any compensation or penalties from failing to fulfil it. Since the 2020 amendments, effective for annual periods beginning on or after 1 January 2022, the cost of fulfilling includes both incremental costs and an allocation of other costs directly related to contract activities. Before a separate provision is recognised, the entity first recognises any impairment on assets dedicated to the contract.

Restructuring provisions

A provision for restructuring is recognised only if the general criteria are met and there is a detailed formal plan for the restructuring, and the entity has raised a valid expectation in those affected that it will carry it out, by starting to implement the plan or by announcing its main features. The provision includes only the direct expenditure arising from the restructuring (such as termination benefits), not costs associated with the ongoing activities of the entity.

A short worked illustration

An entity sells products with a one-year warranty. Based on past experience, 5% of products are expected to need minor repairs costing an average of 40, and 1% major repairs costing an average of 300. For 10,000 units sold before the year end:

Where this typically goes wrong